GUIDELINES ON STORING OF CEMENT ON WORK SITE
In large work or in major construction works, cement is generally stored at site. The cement must be stored in such a manner so that, it can be easily accessible for proper inspection. The building in which cement is stored should be water tight in order to prevent dampness. The guidelines given below should be observed while storing the cement.
1. Cement should not be stored for a long period. During rainy season, the storage time period of cement should be as minimal as possible.
2. Dampness in godowns must be avoided.
3. Cement should not be piled against the wall. A minimum space of 60 cm all –round should be left between the exterior walls and the stacks. The distance between two consecutive stacks should be minimum to reduce circulation of air.
4. Cement should not be piled directly on the floor; instead it should be piled off the floor on wooden planks/crates so as to be clear off the floor by at least 10 to 20 cm.
5. There should not be more than 15 bags in one pile. This is done to avoid lumping under pressure.
6. Owing to pressure on the lower layer of bags, the cement may develop what is known as waterhouse pack. This can be removed by rolling the bags when it is taken out of the stack for use. On account of waterhouse pack, the need not be moved and restacked, as there is no advantage in doing so.
7. If more than 7 bags of cement are to be stored in a pile, then it can be arranged in header and stretcher fashion or alternatively lengthwise and crosswise so as to tie the piles together and to avoid the danger of toppling over.
8. When cement bags is to be stored for a long period or during rainy season, the stack should be enclosed completely in 700 gauge polythene sheet, tarpaulin or any other suitable water proofing material.
9. At the time of removing bags from storage, the older cement should be removed first. For this reason, each consignment as it comes should be stacked separately and a placard indicating the date or arrival should be pinned into the pile.
10. While removing the bags, the first in, first out rule should be applied. It is a good practice to remove bags from two or three tiers rather than all from one tier. If the piles are thus stepped back, then there is less chance of overturning to occur.
11. If different brands of cement are meant to be used on one work, they should be stacked separately.
12. The weight of Portland cement for standard data purposes is taken as 1430 kg per cubic meter. One tone of cement shall comprise of 20 bags, each bag weighing 50 kg. Each bag can be assumed to contain 0.035 cubic meter or 35 litres and 1.25 Cft of cement in volume.
This comment has been removed by the author.
ReplyDeleteMaterials made of plastic are light, durable, and relatively inexpensive. Various products can be easily manufactured from them and used in a variety of ways. Recyclable plastics include Polyethylene Terephthalate (PET), High-Density Polyethylene (HDPE), Polypropylene (PP), Polyvinyl Chloride (PVC), Low-Density Polyethylene (LDPE), Polystyrene (PS).
ReplyDeleteMore info : Plastic Recycling in dubai
Cognac cabinets are a warm and rich type of wood cabinetry that offer a stylish and sophisticated look for any home. Cognac cabinets
ReplyDeleterefers to a color that is similar to the warm amber hue of a fine cognac liquor, which gives the cabinets their distinctive appearance. This type of wood cabinetry can range in color from a light to a dark amber hue and can be made from a variety of wood species, such as cherry, maple, or oak.
In the realm of MEP Estimating , meticulous attention to construction material storage is paramount. Efficient cement storage, as outlined in these guidelines, plays a crucial role in ensuring the quality of MEP projects. By adhering to best practices, such as minimal storage duration during rainy seasons and proper stacking techniques, contractors enhance project efficiency and mitigate risks. These principles resonate with the precision required in MEP estimating, emphasizing the importance of every detail in construction management. Learn more about optimizing MEP workflows for successful project outcomes.
ReplyDelete"This blog is very informative for those involved in construction projects. Proper cement storage is often overlooked but crucial for quality work."
ReplyDeleteweb sealer delhi
centralized dust collector
"The 'first in, first out' rule for cement storage is a great reminder to avoid wastage. Very practical advice!"
ReplyDeletemezzanine floor in delhi
Cardamom Oil Manufacturer Turkey
"Avoiding dampness in storage godowns is such an important point, especially during the rainy season."
ReplyDeletepasta making machine manufacturer delhi
LDPE Sheet in Mumbai
"I liked the tip about enclosing cement stacks with polythene sheets during the rainy season. Very practical!"
ReplyDeleteaxial flow fans bawal
Franchise Event
"Never thought about the impact of pressure on the lower layers of cement bags. Rolling them is a smart solution!"
ReplyDeletecafeteria-furniture noida
pipe conveyor
"The blog explains everything in detail. A must-read for site supervisors and construction workers."
ReplyDeleterack supported mezzanine floor in bhiwadi
heavy duty rack rudrapur
"Using wooden planks to elevate cement from the ground is such a simple yet effective tip to prevent damage."
ReplyDeleteShink bundling machine manufacturer
Fume Scrubber
"I wasn’t aware of the header and stretcher arrangement for stacking cement. Very insightful!"
ReplyDeletemodular mezzanine floor in ranchi
Anise Oil Manufacturer Indonesia
Great point about keeping the storage area watertight to prevent dampness. Moisture is a real enemy of cement!"
ReplyDeletepuff making machine manufacturer delhi
Armour Board mumbai
"This blog should be shared with every construction company. Proper storage can save a lot of
ReplyDeleteDust Collector Manufacturer India
Induced Draft Fan in India
"This blog is like a mini manual for cement storage! Very well-written and to the point."
ReplyDeleteColour Coated in Indore
dust conditioner in noida
"I’ve seen stacks toppling over at sites. The header and stretcher arrangement will definitely help prevent this."
ReplyDeleteevaporative air cooling moradabad
invest in brands
Woven caution tape strong fabric construction withstands outdoor conditions while effectively marking boundaries and hazards.
ReplyDelete