Water Tanks

Image
A water tank is used to store water to tide over the daily requirements. In general, water tanks can be classified under three heads: (i) tanks resting on ground (ii) elevated tanks supported on staging, and (iii) underground tanks. From the shape point of view, water tanks may be of several types, such as (i) circular tanks (ii) rectangular tanks (iii) spherical tanks (iv) Intze tanks and (v) circular tanks with conical bottoms. In the construction of concrete structures for the storage of water and other liquids, the imperviousness of concrete is most essential. The permeability of any uniform and thoroughly compacted concrete of given mix proportions is mainly dependent on the water-cement ratio. The increase in water-cement ratio results in increase in the permeability. The decrease in water-cement ratio will therefore be desirable to decrease the permeability, but very much reduced water-cement ratio may cause compaction difficulties and prove to be harmfu...

Spacing Of Reinforcement In RCC Members

Image
Spacing of Reinforcement in reinforced concrete members: Minimum Spacing between Bars in Tension The minimum horizontal spacing between two parallel main bars shall be diameter of larger bar or maximum size of coarse aggregate plus 5 mm. However, where compaction is done by needle vibrator, the spacing may be further reduced to two-third of the nominal maximum size of the coarse aggregate. The minimum vertical distance between two main bars shall be (a) 15 mm, (b) two-third of the nominal size of coarse aggregate, or (c) maximum size of the bar or whichever is greater. Maximum Spacing between Bars in Tension Normally these spacing will be as mentioned below : (a) For beams, these distances are 300 mm, 180 mm and 150 mm for grades of main reinforcement of Fe 250, Fe 415 and Fe 500, respectively. (b) For slabs (i) the maximum spacing between two parallel main reinforcing bars shall be 3dor 300 mm or whichever is less, and (ii) the maximum spacing between t...

Requirements For Concrete MIix Design

Image
Requirements of concrete mix design should be known before calculations for concrete mix. Mix design is done in the laboratory and samples from each mix designed is tested for confirmation of result. But before the mix design process is started, the information about available materials, strength of concrete required, workability, site conditions etc. are required to be known. Following are the information required for concrete mix design: 1. Characteristic strength of concrete required: Characteristic strength is the strength of concrete below which not more than 5% of test results of samples are expected to fall. This can also be called as the grade of concrete required for mix design. For example, for M30 grade concrete, the required concrete compressive strength is 30 N/mm2 and characteristic strength is also the same. Fig: Characteristic Strength of Concrete 2. Workability requirement of concrete: The workability of concrete is commonly measured by slump test. The slu...

Concrete Without Cement – A Green Alternative

Image
Concrete without cement is possible with the use of flyash as an alternate for cement. Concrete is the most common material used for construction due to its properties such as strength, durability and easy availability. But cement is commonly used in preparation of concrete. Cement has excellent binding property but its production requires large amount of energy which contributes for pollution and global warming. The process of cement production starts from mining for raw materials, crushing, blending and heating these materials at high temperature of 15000C and finally creating cement from heated materials. All the process involved in manufacturing of cement requires large amount of energy, it involves huge costs, contributes to increase in CO2 emissions and other greenhouse gases. The production of cement contributes to 7% of the emissions of greenhouse gases and it is likely to double by the year 2014. As the demand for more and more infrastructures is increasing day by day,...

Liquid Penetrant Inspection Of Concrete

Image
Liquid penetrant inspection is a non-destructive testing method for detection of crack penetration depth in concrete. This method is used when visual inspection is not enough to detect cracks in concrete, especially in the case of liquid retaining structure. In this method, a liquid with high surface wetting characteristics is applied to surface where cracks are appearing. Then excess liquid from the cracks are removed. This is done by applying a developer (powder) to pull out the trapped penetrant liquid from the cracks. This powder is spread on the surface for cracks propagation to be seen. The cracks in concrete are detected by visual inspection process. The penetrant used is often loaded with a fluorescent dye and inspection of cracks is done under ultra-violet light to increase the test sensitivity. Liquid penetrant inspection method is used for location of surface breaking defects in non-porous materials. Based on capillarity action, low surface tension fluid penetrates i...

Records To Be Maintaned At Construction Site

Image
Records to be maintained at construction sites play important role in construction activities. It is a document required to prove any construction activity has taken place at site during billing or any other claims. These records have all the data of various construction activities carried out at site. If any additional work has been carried out and it is claimed during billing, these documents need to be produced as a proof. Maintenance of records also helps during audits of construction projects at any point of time. These documents helps to defend any claims such as liquidated damages or false claims or violations of any guidelines by authorities or clients. Following are the various records that need to be maintained at construction site: 1. Contract Agreement: Contract agreement documents including all sets of drawings, including amendments, a copy of approval of municipality, corporation or urban development authorities need to be maintained at construction sites till...

High-Strength versus High Performance Concrete

High-Strength versus High Performance Concrete High strength concrete and high-performance concrete are not synonymous because strength and performance of concrete are different properties of concrete. High-strength concrete is defined based on its compressive strength at a given age. During 1970s, any concrete mixtures which showed 40 MPa or more compressive strength at 28 days were designated as high strength concrete. As the time passed, more and more high strength concrete such as 60 – 100 MPa, were developed which were used for the construction of long-span bridges, skyscrapers etc. While high strength concrete is defined purely on the basis of its compressive strength, Mehta and Aitcin defined the high-performance concrete (HPC) as concrete mixtures possessing high workability, high durability and high ultimate strength. ACI defined high-performance concrete as a concrete meeting special combinations of performance and uniformity requirements that cannot always be achi...